What We’ve Done

What We’ve Done

Click on the tabs below to view a few examples of our extensive experience over the past 25 years.

 

Woodland Park Apartments Portfolio in E. Palo Alto, California

woodland1On this distressed 101 building apartment and commercial building portfolio (including over 1,800 apartment units), we increased tenant occupancy, addressed deferred maintenance and resolved significant pre-receivership litigation.

5th Street Apartments in Santa Monica, California

5-st-aptEvaluated and proceeded with construction of these two six-story, 50-unit apartment buildings, located two blocks from the 3rd Street Promenade in Santa Monica.

The Met at South Coast, Santa Ana, California

The-Met-AerialRefinanced property, restructured the existing development agreement and sold this 3.1 acre site, entitled for 271 apartments.

Willow Park Apartments, Forest Park, Georgia

willow-peakAsset manager for 14 building, 108 unit apartment complex.

Cypress Park Villas, Monterey, California

cypressparkResolved DRE issues, completed unit renovations and sold out the condominium units on a ‘retail basis’ in this once-stalled 128 unit condominium project.

College Park in Chino, California

College-Park-aerial-photoReceiver for College Park, a 350 acre subdivided tract home development involving complex development issues.

The Estancia Lucero Condominiums, Santa Barbara, California

4004ViaLucero_03_1Completed construction of this once-stalled upscale condominium project.

The Hideaway and Bungalows at the Beach House in Port Hueneme, California

villa
Restructured a complex entitlement agreement, completed infrastructure repairs and sold this partially built-out residential development of single family homes, townhomes and finished lots in Port Hueneme. A portion of the standing inventory was sold on a conventional retail basis, while the balance of the property was sold on a bulk sale basis.

660 S. Figueroa Tower in Los Angeles, California

figtowerManaged operations of this 28 story, 281,000 square foot Class “A” office tower located in Downtown Los Angeles.

Media Tower in Burbank, California

mediacenter2Managed operations and leasing of this ten story, 151,000 square foot Class A office tower located in the Burbank Media District including leasing to full floor tenant.

Spectrum Business Park in Redlands, California

spectrumManaged operations and marketed for sale this newly constructed, 12 building, 31 unit office condominium business park.

Scripps Corporate Center in San Diego, CA

scripps-photoManaged operations for this 35,000 square foot office building including lease expansion of an existing tenant.

Pigeon Pass Plaza in Merino Valley, California

pigeon-passplazaAsset and disposition manager for the lender including entitlements, tenant improvements, leasing and sale of this 63,000 square foot shopping center.

Pioneer Bakery Building in Venice, California

Pioneer-Bakery-RenderingRedevelopment of commercial bakery into condominiums, including entitlement, design, leasing and sale of land approved for 75 condominiums and 10,000 square feet of retail over three levels of subterranean parking.

Kincaid’s Restaurant at Redondo Beach Pier

Kincaid's-Restaurant-photoLeasing and construction oversight of this 10,000 square foot restaurant on Redondo Pier.

Don Carlos Shopping Center in Mesa, Arizona

don-carlos-shopping-centerReceiver and Bankruptcy Custodian for this 11,560 square foot shopping center, including lease extensions, operations and marketing for additional leasing.

Parthenia Industrial Park in Northridge, California

Parthenia-picture3 building / 55,000 square foot industrial park, leased to 100% occupancy.

Hajoca Plumbing Supply in Hawthorne, California

Hajoca-Plumbing-Supply-photoRedevelopment, entitlement, leasing, and sale of 30,000 square foot high-bay industrial building including addressing eminent domain issues.

Artesia Place Industrial Park in Bellflower, California

Artesia-Place-IndustrialEnvironmental remediation, construction management, leasing and sale of 47,150 square foot multi-tenant industrial park.

 

Eton Avenue Industrial Building in Warner Center, California

Image---Eton-Avenue-IndustrialManaged Earthquake retrofit, structural repairs, and disposition of this 30,000 square foot industrial building.

 

Ramada Inn in Garden Grove, California

1 Ramada-Inn-Garden-Grove-photoManaged operations for this 116 room hotel.

Best Western Colorado Inn in Pasadena, California

2 Best-Western-Colorado-Inn-Pasadena-photoManaged operations for this 80 room hotel.

issues.

City Inn in Torrance, California

3 City-Inn-Torrance-photoManaged operations for this 51 room hotel

 

Nutel Motel in Los Angeles, California

4 Nutel-Motel-Los-Angeles-photoManaged operations for this 137 room hotel.

 

 

Global Self Storage in Norco, California

Global-PictureManaged operations of this 908 unit, 113,400 square foot self-storage facility.

Downtown LA Church in Los Angeles, California

church-big1Project manager for completion of new church facility with a 2,000 seat sanctuary, a 1,000 seat meeting hall, a gym and a 500 car parking structure.

Fullerton Golf Training Center in Fullerton, California

Fullerton-Golf-CenterManagement of a 5.5 acre mini-golf course, driving range and pro shop.

LAUSD – Science Center Elementary School

LAUSD-Science-Center-Elementary-School-photo-1Interim management / reorganization of $1 billion school site acquisition program comprising approximately 200 school sites, including negotiation of multiple joint-use and shared-use school site agreements with other public agencies including the California Science Center, Cal State Northridge, Metropolitan Transportation Authority (MTA), Accelerated Charter School and Orthopedic Hospital.

Copyright 2013 Wald Realty Advisors All Rights Reserved